Site survey guide

Bottle washer pre-installation site survey: what to check before order

A bottle washer pre-installation survey checks whether the proposed washing route can be installed, operated and maintained on the real site. It should cover utilities, drainage, access, conveyor interfaces, guarding, cleaning access and responsibility boundaries before a project is approved.

Direct answers

Key questions answered on this page.

Use these answers to prepare a clearer bottle-washing enquiry before machine selection.

What should a bottle washer site survey include?

A bottle washer site survey should record the machine location, infeed and outfeed route, available footprint, access for operators and maintenance, water supply, drainage, compressed air, electrical supply, extraction or ventilation needs where relevant, floor condition, door access and the relationship with the filler, capper, labeller and conveyors.

  • Bottle drawings and target output
  • Available water supply, pressure and treatment route
  • Drain point, solids interception and trade-effluent route
  • Electrical supply, isolator location and compressed-air availability
  • Conveyor height, direction, accumulation and reject route
  • Operator side, guarding interface and cleaning access

Which utilities should be confirmed before a bottle washer quote?

Utilities should be confirmed as site facts rather than assumed from a generic machine description. Power, water, air, drainage and any heating or chemical-dosing requirements depend on the selected route, bottle condition and options, so Lancing needs the actual services available at the intended position.

  • Voltage and phase available at the machine position
  • Water source and any treatment or filtration already installed
  • Drain capacity and whether wastewater is likely to be trade effluent
  • Compressed-air pressure and quality if drying or pneumatic functions are required
  • Space for chemical storage or dosing only where the process requires it

How should the installation boundary be written?

The installation boundary should state who is responsible for conveyors, utilities, drainage, guarding interfaces, lifting, electrical connection, commissioning support, samples, cleaning chemicals and acceptance testing. Clear boundaries reduce late cost changes and make the FAT or site acceptance test easier to interpret.

  • What Lancing supplies
  • What the site supplies
  • What existing equipment must interface
  • Who confirms chemistry, safety and trade-effluent permissions
  • How the machine will be unloaded, positioned and serviced

How to use this guide in a bottle-washing project.

Use the guide to prepare information for discussion; final machine suitability still depends on bottle samples, site services, safety review and the agreed scope.

Project stageDecision to makeUseful next page
Initial enquiryShare the bottle family, condition and target output
Trial or reviewCheck the evidence or samples that prove the routeBottle Washing Line Integration Controls
Specification sign-offConfirm responsibilities, utilities and acceptance criteriaBottle Washing Water Quality Trade Effluent

Authoritative checks to consider

Send the evidence before selecting a route.

Lancing can review bottles, residue, target output, utilities and the existing line layout before preparing a machine shortlist.

Send a bottle-washing enquiry
Related guides

Continue the bottle-washing specification.

These related pages help connect this guide to machine selection, validation and quotation.

Contact

Use this linked page to continue the specification and enquiry route.